Showing posts with label Production. Show all posts
Showing posts with label Production. Show all posts

Wednesday, 26 February 2014

Production: Trailer Update 6



What has been done:


  • Sound added to the footage.
  • Sound synced to match the image.

Monday, 24 February 2014

Production: First Draft of Trailer Sound



I have created the first draft of the background music for the trailer my partner has uploaded this to Soundcloud so it is easily accessible and shareable.

Thursday, 20 February 2014

Production: Poster Update


I didn't think my original poster idea was working so I have changed it quite a lot. I think the main reason it wasn't working is because it was horizontal which didn't give me much room, whereas now I am able to add much more to it, like the quotes from magazines.

Wednesday, 19 February 2014

Production: Trailer Update 5




What has been done:


  • 10 more shots to the sequence of the trailer.
  • Used image and audio enhancement on all of these clips.
  • Adjustment of the timing of some of the shots - now less than one minute long (see last meeting post for reasons for this).
  • Removed the audio from the montage of clips (0:39 - 0:44) and instead added audio from another shot.

Production: Trailer Update 4



What has been done:
  • Improvements made to audio quality of clips, reduced background noise. Used the 'Frequency Remover' tool to remove the wind from the outdoor scenes, and electronic interference in dialogue.
  • Improvements to image quality making the opening shots sharper.
  • Shortened the trailer again to give more time for the title sequences and credits to be added.

Production: Poster Development

Here are the changes I have made to my poster




Production: Editing of the poster image

Tuesday, 18 February 2014

Production: Trailer Update 3



What has been done:
  • 10 more shots have been added to the trailer.
  • Used image and audio enhancement on all of the new clips.
  • Adjustment of the timing of some shots to make the trailer be less than one minute long.
  • Removed the audio from the montage of clips (0:39 - 0:44) and used the audio from another shot.

Monday, 17 February 2014

Production: Trailer Update 2



What has been done:
  • Trimmed down and added 10 new shots to the trailer. 
  • Used the audio and video stabilisation/enhancement features of Final Cut Pro X to improve image and audio quality of the clips.

Saturday, 15 February 2014

Production: Trailer Update 1

My partner is currently in the editing process of the trailer, I will be putting the progress on here as and when I am updated my partner.




What has been done so far:
  • Trimmed first 12 shots (which make up the first 20 seconds of the trailer) using Final Cut Pro X.
  • 'Automatic audio enhancement' feature of Final Cut Pro X has been used on each clip.
  • 'Automatic shake reducement' feature in Final Cut Pro X has been used on each clip.
  • Each of the clips have been structured to our 'Shot List'.

Friday, 14 February 2014

Production: Editing the Magazine

Production: Magazine Update


Production: Editing of Magazine Photo

Production: Behind the Scenes

A few behind the scenes photos from our filming day.
Fill lights used to help us control the lighting for the filming & photographing.

A still shot from the trailer.

Script, used to help the actors prepare for filming, it also help myself and Jake so we knew where we were up to and what needed to be done next.


This is the shot list after we had finished filming. It helped us a lot in knowing what needed to be done & what had yet to be done.

Production: Edited Magazine Photograph





Original 
Edited/Finished